CHECKS AND DOCUMENTATION

Testing electrical panels

Electrical and functional checks depend on the panel purpose, design and applicable requirements. Establish what is checked, which results are documented and the scope needed for the specific installation.

CHECKING SCOPE

What does electrical panel testing include?

The checking scope depends on panel type, purpose and applicable requirements. Electrical construction, specified functions and documentation are distinct aspects that must be coordinated.

  • Electrical checks

    Electrical checks concern the completed assembly and its electrical connections. Depending on panel type and purpose, they may cover protective circuits, wiring, connections and insulation properties.

    The exact methods and scope are determined by the relevant requirements for the specific assembly.

  • Functional checks

    For control panels, distinguish electrical integrity from the operation of specified functions. Functional checks may concern control commands, signalling and system responses within the agreed scope.

    Checking a panel alone is not automatically equivalent to testing a complete machine or plant.

  • Results and documentation

    Check results must be linked to a specific electrical panel and the procedures performed. Depending on the subject and requirements, documentation may include assembly data, the checking scope and results.

    The document title, contents and responsibility for issue depend on the actual type of check.

SUBJECT OF CHECKS

Checks according to the type and purpose of the electrical panel

Different technical requirements may apply to distribution and control panels. Before checking, establish the assembly purpose, design and boundaries of the system concerned.

Electrical distribution panels

For distribution panels, circuit design, protective components and intended operating conditions matter. Applicable checks depend on the construction and characteristics of the specific assembly.

Electrical control panels

Control panels connect electrical equipment to specified control functions. Alongside appropriate electrical checks, some installations require the scope of signalling, command and other agreed function checks to be clarified.

Checks before acceptance

Before accepting an electrical panel, identify the specified checks and accompanying documentation. This clarifies what has been checked on the assembly itself and what belongs to connection or testing of the wider system.

FROM INFORMATION TO RESULTS

How is the scope of checks defined and carried out?

Before testing, clearly identify the panel, its characteristics and the subject of the check. Methods, responsibilities and documentation are then determined by applicable requirements and the agreed scope.

  1. Electrical panel information

    The starting point is the panel type and purpose, known technical characteristics and available documentation. Establish whether the assembly is new or existing and the purpose of the requested check.

  2. Defining the scope

    Clarify the subject, applicable requirements and available documents. This information determines the checks required and who is responsible.

  3. Carrying out checks

    Appropriate checks are performed according to the assembly type and defined scope. Electrical properties and specified functions are considered separately where the particular design requires it.

  4. Handover

    Recording results

    Check results must be recorded and linked to the panel concerned. If defects are found, further action and any repeat checks are determined by responsibilities and the agreed scope.

MEASURING EQUIPMENT

Equipment for electrical testing.

An overview of measuring instruments, workshop equipment and documentation.

Selected references

Selected companies and organisations listed on KLALU's reference list.

FREQUENTLY ASKED QUESTIONS

Questions about electrical panel testing

All questions

What is the difference between panel testing and an “atest” document?

Panel testing involves specific technical checks according to assembly type and applicable requirements. The results can be recorded in appropriate documentation.

The Croatian term “atest” is often used generally for a confirmation or document concerning correct operation, but it is not precise enough to define the type of check or document by itself. It is therefore important to clarify what is being tested and which document is required.

What is the difference between a test report and a declaration of conformity?

A test report records the subject, scope and results of checks performed. Its contents depend on the test type and applicable requirements.

An EU declaration of conformity is a separate document in which the responsible manufacturer declares that a product meets the applicable requirements of relevant legislation. A test report and a declaration of conformity serve different purposes and do not automatically replace one another.

What is the difference between routine verification and design verification?

Routine verification concerns an individually manufactured assembly and checks its properties against applicable requirements.

Design verification demonstrates particular characteristics of a design solution. In the context of applicable standards for low-voltage switchgear assemblies, these verifications have different purposes and cannot automatically be equated.

What information should be provided for a panel check?

For an initial enquiry, state the panel type and purpose, basic technical data and the purpose of the requested check. Indicate whether the panel is new or existing and what documentation is needed.

Attach available electrical schematics, technical documentation or manufacturer and installed equipment information. This can clarify the subject, responsibilities and scope of the checks.

What happens if a panel does not pass a check?

If defects are found, they must be recorded and further action determined according to their nature and the responsibilities of the participants.

Depending on the defect, corrective action and repeat checks may be needed. Testing alone does not guarantee a positive result or replace correcting identified irregularities.

Is electrical installation testing the same as electrical panel testing?

No. Electrical panel testing concerns a specific electrical assembly, its design and applicable technical requirements.

Electrical installation testing concerns the installation and its associated requirements. Although checks may be related, their subject, applicable standards and responsibilities are not automatically the same.

SEND US YOUR ENQUIRY

Need information about electrical panel testing?

Send information about the panel type and purpose and available technical documentation. State the type of check or documentation needed so we can clarify the subject and possible scope.

KLALU d.o.o. · Website under development

In preparation

This content will be available in the next stages of website development.

Cookie settings

Choose optional categories. You can change your decision in the website footer.

Google Ads is not enabled. Contacting us does not require consent to tracking.